How do you adopt ODC?
你如何采用ODC ?
Assign ODC roles to developers and testers.
给开发人员和测试人员指派odc角色。
ODC as a way to control product status.
OD C可被作为一种控制产品状态的途径。
Using ODC to evaluate testing efficiency.
用odc评估测试的效率。
Using ODC to provide better exit criteria.
使用ODC提供更好的退出标准。
Team member: It is the most common role in ODC.
团队成员:这是ODC中最普通的角色。
Using ODC to evaluate defect-fix efficiency.
用odc评估缺陷修复的效率。
The action plan and ODC phase recommendations.
行动计划以及ODC各阶段的建议。
The ODC lifecycle contains three different roles.
OD C生命周期包括三个不同的角色。
ODC aims at finding trends and not only collecting data.
ODC的目标不仅仅是收集数据而是找到发展趋势。
Figure 2 shows one RCQ window after our ODC customization.
图2显示了我们将ODC用户化以后的一个RCQ窗口。
Using ODC to evaluate design sufficiency and code sufficiency.
利用ODC来评估设计和代码的充分性。
ODC enriches defect attributes by collecting useful information.
ODC通过搜集有用的信息丰富了缺陷的属性。
Note that these people should be included in the ODC special group.
注意这些人应该包含odc特殊团队的成员。
There are eight ODC attributes in total, as shown in Figure 1.
ODC一共有8个属性,如图1所示。
So ODC focus points do the correct validation based on the input data.
因此odc集中要点,基于输入的数据做出正确的确认。
ODC has three possible cycles according to how many steps are involved.
根据ODC所需的步骤的数量,它有三个可能的循环。
In my experience, ODC can help developers and testers collaborate better.
就我的经验而论,ODC能够帮助开发人员和测试人员更好的合作。
ODC is particularly helpful under one or more of the following conditions.
在以下一个或者多个条件下,ODC是十分有用的。
ODC is a live state model, showing the topology of the current running system.
ODC是一个活动的状态模型,显示当前运行系统的拓扑。
Option two: Generate ODC "Exit Evaluation Report" and start analysis from it.
选项2:生成一个ODC“退出评估报告”,并从它开始分析。
Here, I will provide some general advice for each phase within the ODC process.
这里我将对ODC使用过程的各个阶段提一些建议。
At a high level, ODC is a defect classification scheme that helps capture defect information.
ODC在高层次上,是帮助获取缺陷信息的一个缺陷分类方案。
Training activities at the beginning phase are very important for successful execution of ODC.
开始阶段的培训活动对成功执行odc是十分重要的。
Two people form the ODC special group, one from development team and another from testing team.
两个ODC特殊团队的人,一个来自开发团队,另一个来自测试团队。
Medium cycle: It includes four steps, and these four steps are the core components of the ODC life.
中等循环:它包含四个步骤,这几个步骤是ODC生命周期中的核心组成部分。
In our case project, I was invited to be the ODC focal point, and I am also in the development team.
在我们的案例项目中,我被邀请作为ODC的核心人物,同时也是开发团队的成员。
The points and times you perform ODC assessment will affect quality-improvement effort and effectiveness.
你执行ODC评估的检查点和检查时间将影响软件质量的提高和效率。
The examples presented here are designed to demonstrate how to integrate ODC into a software project.
这里展示的范例是用来论证怎样将ODC整合到软件项目中的。
Before adopting ODC, our exit criteria for each phase were only evaluated by the pass ratio of test cases.
在采用ODC之前,我们每个阶段的退出标准仅仅是根据测试用例的通过率来决定的。