词典宝
更多
查询
1 词典释义:
tbm
时间: 2025-03-21 04:00:57
英 [ˌtiː biː ˈem]
美 [ˌtiː biː ˈem]

abbr. 战术弹道导弹(Tactical Ballistic Missile的缩写)

双语例句
  • Here's another Grumman aircraft, the TBM Avenger.

    这里的另一个格鲁曼飞机,隧道掘进机复仇者。

  • During the construction, the imported TBM was first used.

    施工中,首次引进敞开式全断面挖掘机(TBM)。

  • Cutter is the key factor that affects TBM′s boring speed.

    TBM刀具是关系TBM掘进速率的基本要素。

  • Results The total leucocytes increased in CSF of TBM patients.

    结果结核性脑膜脑炎患者脑脊液白细胞总数升高。

  • Especially, the system of excavation is one of key parts of TBM.

    尤其是盾构的开挖系统是盾构机组成系统的核心之一。

  • This article thus provides new research results for the TBM tunneling field.

    因此,本文在这一领域的研究成果是新颖的。

  • The methods of the forced ventilation and mixed ventilation in TBM construction are compared.

    对比分析了TBM施工中一般是采用压入式通风和混合式通风的优缺点和适用条件。

  • The cause of deviation of driving with TBM in Qinling Tunnel is the difficult geological condition.

    由于秦岭隧道部分地段地质方面的原因,使TBM在掘进中发生了偏离现象。

  • In this paper, the state of rock debris cutted off by TBM in different geological conditions is presented.

    文章介绍了围岩在TBM刀具作用下,不同地质条件下形成的岩碴的状态。

  • A suggestion was given that we should enforce CBM on the basis of TBM, to realize maintenance on forecast finally.

    提出应在定期检修的基础上加大状态检修力度,最终实现预知检修。

  • TBM-6 type blade shape measure Instrument for hydraulic turbine runner and its application were introduced in this paper.

    本文介绍了T BM - 6型水轮机转轮叶型测绘仪及其应用情况。

  • TB880E hard rock TBM was imported from WIRTH Company of Germany according to the construction condition of Qinling tunnel.

    TB 880e掘进机是根据秦岭隧道的修建条件而从德国WIRTH公司订购的全断面硬岩掘进机。

  • On the whole, this is a good experience for the construction of the tunnel with large cross-section and super length by TBM.

    实践证明,在大断面超长隧洞TBM施工段设置中间施工支洞,是一个成功的经验。

  • The research and application of the TBM-6 type blade shape measure Instrument for hydroturbine runner were introduced in this paper.

    全面介绍了T BM - 6型大型水轮发电机组水轮机转轮叶型测绘仪的开发、研制及应用情况。

  • Research purpose: as a main tool to cut rock, disc cutter was mainly assembled on cutting wheel of TBM, mixed shield and rock shield.

    研究目的:盘形滚刀是一种重要破岩刀具,主要用在掘进机(TBM)、复合式盾构及岩石盾构的刀盘上。

  • Abstract: : TBM(Tunnel Boring Machine) Cutting Tools Configuration is one of the most important factor during TBM cutting tool design.

    摘罗要:盾构机刀具配置是盾构机刀具设计中是非常重要的内容。

  • The helium cooling system is an important ancillary system of the dual-functional lithium lead test blanket module(DFLL-TBM) for ITER.

    氦气冷却系统是ITER中国液态锂铅实验包层模块(DFLL-TBM)在ITER装置内进行实验的重要辅助系统。

  • Objective to assess the clinical, laboratory, radiological features of TBM in the aged TBM patients and probe the strategy of treatment.

    目的评估老年人结核性脑膜炎的临床、实验室和影像学特点,并探讨治疗对策。

  • Combining the soil pressure balance TBM selected in certain tunnel construction, the paper makes check calculation to the key parameters.

    并结合某隧道施工中选用的土压平衡盾构机,对关键参数进行了校核计算。

  • Correctly determining quality parameters of rock is the theoretical basis of use of TBM (full face rock tunnel boring machine) and its design.

    正确确定岩石的性能参数是全断面岩石掘进机使用及高性能全断面岩石掘进机研制的理论基础。

  • The shield TBM is regarded as an effective tool during construction under soft geological condition, which has a history of 30 years in China.

    盾构掘进机是在软弱地质条件下安全施工的有效机具,在我国已有30多年的历史。

  • By experts'measures, the TBM will pass through 13 buildings underground. Precise measures have been taken to ensure the safty of the buildings.

    经过测量,盾构机需要下穿13栋建筑物,事先已采取周密的监测措施保障建筑物的安全。

  • With TBM is applied in the tunnel construction comprehensively, study of advance geological prediction on the basis of TBM construction overhangs.

    随着TBM广泛应用于隧洞施工,致使基于TBM施工的隧洞超前地质预报研究日显突出。

  • Objective To study the characteristics of T-lymphocyte subpopulations in the patients with tuberculosis meningitis (TBM) and pulmonary tuberculosis (PTB).

    目的探讨结核性脑膜炎(TBM)与活动性肺结核(ptb)病人T淋巴细胞亚群特点。

  • Being a crucial factor in influencing the performance of Full Face Rock Tunnel Boring Machine (TBM), the cutterhead design is one of the key issues of TBM.

    刀盘设计是全断面岩石隧道掘进机(TBM)的设计关键,是影响其掘进性能的决定性因素。

  • The paper has brought out functions of the reentry trajectory of TBM in case of the predigest model of atmosphere and solved them by the Runge-Kutta method.

    文中在简化的大气模型下建立TBM的再入段方程,并采用龙格-库塔法来求解,通过仿真,可以看出模型符合仿真需要。

  • A simulation of dynamic forces acting on invert prefabricates in TBM construction tunnel is made with surrounding rock-structure model by using ANSYS software.

    运用计算软件ANSYS,采用围岩—结构模式,对TBM施工隧道仰拱预制块进行模拟动态施工的受力计算研究。

  • This paper introduces the used safety measures and the matters needing attention in construction of tunnel cut by TBM method in Tashan coal mine of Datong City.

    文中介绍了用隧洞掘进机(TBM)在大同塔山矿主平峒掘进施工中采取的安全措施和应该注意的事项。

  • Situation monitoring and trouble diagnosis expert system for TBM is developed. The structure principle, inference rule and goal attaining process are described.

    基于专家系统工具,开发了TBM状态监测和故障诊断专家系统,阐述了系统的结构原理、推理规则、目标实现过程。

相关推荐