词典宝
更多
查询
1 词典释义:
project schedule
时间: 2025-01-11 10:42:49
英 [ˈprɒdʒɛkt ˈʃɛdjuːl]
美 [ˈprɑdʒˌɛkt ˈskɛdʒəl]

项目进度;工程进度;项目日程表

双语例句
  • The project schedule is practical.

    项目时间表是可行的。

  • Integration of the WBS in the Project schedule.

    在项目日程中整合wbs。

  • Schedule control-controlling changes to the project schedule.

    进度控制——控制项目进度的变更。

  • Use the project schedule to justify pursuing one of these options.

    在协商的过程中,你需要基于项目时间表,在多种选择中作出决断。

  • May be referred to as a subnetwork in a project schedule network diagram.

    在项目计划网络图中可以叫做子网络。

  • Drafting a work breakdown structure (WBS) as the basis for a project schedule.

    草拟以项目计划为基础的工作故障结构(WBS)。

  • They collected and logged in the most expedient method for the project schedule.

    他们以最便利的方法为项目进度收集数据并记录。

  • So, those are the 6 steps you need to know to create a successful project schedule.

    以上,就是你必须知道的建立一个成功地项目计划表的6个步骤。

  • You must take time out of your project schedule to invest in process improvement activities.

    您需要从项目进度中拿出时间来投入到过程改进活动中。

  • Your entire project schedule is now dependent on heroic efforts by a number of "single resources.

    现在你的整个项目时间表都由这个英雄般的“单个开发人员” 1 负责。

  • The concept is to define a very conservative stance in the early inception of the project schedule.

    这就是说,要在项目的最初阶段以一个非常保守的姿态出来。

  • It is fun, but we don't really have these creative extensions accounted for in our project schedule.

    这很有趣,而且我们实际上并未因为这些创造性的附加劳动而占用项目的时间表进程。

  • Context: Motley has been thinking about how to apply agile principles to an overall project schedule.

    马特里一直以来在思考如何将敏捷开发原则应用到整个项目计划中去。

  • Products don't always integrate well with others, impacting developer productivity and project schedule.

    各个产品通常与其他产品的集成性能并不好,而这会对开发人员的效率和项目进度造成影响。

  • Some units aren't able to meet integration and system-testing deadlines in the stringent project schedule.

    某些单位无法在严格的项目时间表中按期完成集成和系统测试。

  • Testing the wrong builds (or functions) results in wasted time, and can severely impact the project schedule.

    测试错误的工作版本(或功能)会导致时间的浪费,并严重地影响项目进度。

  • A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.

    我曾针对自己的所有项目召开过一次很关键的会议,是关于问题、风险、项目进程明细表的回顾会议。

  • Prepare project management for some project, control project schedule, control project cost and down project risk.

    参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;

  • We'll probably do the requirements, and he'll likely be the one to come up with the project schedule, and so on," said Harriet.

    我们大概要做这些需求,并且他可能是提出项目进度表的人,等等。” Harriet说道。

  • If the team is stuck in a holding pattern until a decision is made, this can add days, weeks, or months to the project schedule.

    如果团队在作出决策前出于停滞状态,这就可能将项目计划延长数天、数周甚至数月。

  • Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.

    编制进度计划——分析工序顺序、工序持续时间和资源需求。

  • For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.

    对于进度控制,可以将项目活动的实际进度和项目的计划进度进行比较,以监督项目的进度实施。

  • Test motivators are documents that may relate to the test effort, such as a project schedule, a requirements document, or a project plan.

    测试激发因素是和测试努力相关的文档,例如一个项目进度表、一个需求文档、或者一个项目计划。

  • The reuse of assets within the project can have a significant bearing on the project schedule, cost, and quality of the delivered system.

    工程中资产的重新利用对于工程的时间进度表,成本,以及可交付系统的质量有十分重要的意义。

  • By doing this prioritization and comparison with your manager, you clarify the value of each activity regarding the overall project schedule.

    通过与你的经理进行优先级讨论和比较,对于整个项目时间表上的每一个活动你都会有更清晰的认识。

  • The use cases shown in Table 1, along with a two-page project plan that includes an MS Project Schedule export, constitute the documentation.

    表1所示的用例与包含MS project 进度表输出的两页项目计划共同构成了文档文件。

  • Usability testing is not just a milestone to be checked off on the project schedule. A usability test is not finished when the last participant leaves.

    可用性测试不仅仅是用于核对项目进度的一个里程碑,你要知道,当最后一个参与者完成任务的时候,可用性测试还没有结束。

  • [The shop] is designed as a permanently temporary space with the flexibility to respond to the gallery's fast-changing exhibition and project schedule.

    (该店)被设计为一个永久性的临时空间,它的灵活性可以应对画廊不断变化的展览和项目日程。

  • Portal software, by itself, is quite straight forward; it is the complexity of integrating diverse systems that leads to most of the time in the project schedule.

    门户软件本身相当简单;只是由于集成的复杂性而使得各个系统在项目计划中花费了大多数时间。

相关推荐